LLC «Bimex Group»

«Bimex Group»

Phone: +7 (495) 988-80-43


TO INNOVATE AND PERFECT
 
+7 (495) 988-80-43
 
INTERNATIONAL FREIGHT FORWARDER

 
Main  → Our projects

Our projects

Errors (2)
Error: DB error: execution error. Îøèáêà â õîäå èñïîëíåíèÿ çàïðîñà.

Error: DB error: execution error. Îøèáêà â õîäå èñïîëíåíèÿ çàïðîñà.
more

Transportation of two transformers

Shipment of transformers equipment to Euphrates Dam (Al-Saura, Syria)...

 
more

Transportation of Hot-forging press from Voronezh, Russia to India and Brazil.

Shipment of goods from the factory in Voronezh was carried by road, where the normal positions were loaded into standard trucks, and oversized for special low-bed trucks. The road transportation was carried...

 
more

Transportation of pipe bender SUPERIOR SPB 48-60

Transportation of the pipe bender SUPERIOR SPB 48-60 from Italy to the Far East...

 
more

Transportation of pipe bender SUPERIOR SPB 36-48

Transportation of the pipe bender SUPERIOR SPB 36-48 from Italy to Russia...

 
more

Transportation of the complex mixing

Transportation of the complex mixing from Samara (Russia) to the port of Sharjah (UAE)...

 
more

Transportation of heavy equipment from South Korea to Lisky in the Voronezh region of Russia

 The project of BIMEX GROUP LLC for the transportation of overweight cargo (Complete automatic technological line în manufacture and processing casing gas-oilwire, ðãîfilåelectrowelded...

 
more

Transportation of heavy presses (about 5000 freight tons) from Voronezh (Russia) to Tianjin port (China).

Delivery of cargo from Voronezh to port Novorossiysk was realized by rail in several stages. Overall items packed in wooden cases were shipped in railroad open wagons and flat wagon, and heavy and oversized...

 
more

Transportation of the crank hot forging press KA8546.01 by the capacity of 4000 TF from Voronezh for export to Italy.

 Transportation of the disassembled parts of the press to the port of Saint Petersburg was carried out by road transport, including heavy items - frame 100 tons and table 80 tons at modular systems...

 
Previous page   1 2 3   Next page