Transportation of the pipe bender SUPERIOR SPB 48-60 from Italy to the Far East.
The total weight of the machine assembly - 107 tons. In order to minimize transportation costs bender was dismantled into several pieces. Shipment was from the city of Parma (Italy), by road, then via the port of Kiel (Germany) on the ferry line DFDS. Upon arrival at the port of St. Petersburg, after customs clearance, the bender was taken by road to the railway station Rzhevka (Oktyabrskaya Railway), and reloaded on the rail wagons. Railway transportation to st.Dzemgi (Far Eastern Railway), then transshipment to the low-bed trucks for delivery to the town of Black Cap.